Sarjaro were contracted by Mavtech to design, construct, mobilise, setup and commission a filtration treatment plant to treat the contaminated water / spoil which is produced during their piling operations.
The Mavtech Water Treatment Plant was designed to fit within one 20ft, self-bunded shipping container, as it is required to be mobile and be moved from site to site for different projects.
The system was designed to treat a wide variety of contaminants as Mavtech’s works would range from site to site. The primary contaminants which are targeted through the system are hydrocarbons, metals, suspended solids, total organic carbon, dissolved organic carbon and PFAS.
Following commissioning, Sarjaro provided training to Mavtech staff to operate and maintain the system. As required, Sarjaro assist in more specialty activities and maintenance.